Marathon Pipe Rack Modifications

Description

Magnum Geo-Solutions designed piles that could support high axial and lateral loads while still being installed in areas beneath existing pipe racks with restricted headroom clearance as part of a pipe rack modification project across the Marathon Garyville Refinery.

Related Projects.